European Battery Ecosystem β Connecting Strategy and Implementation
A dedicated networking event on pilot-line validation, manufacturing readiness, and shared industrialization support structures.
π Event Key Information
- Date & Time: Friday, 6 November 2026 | 09:00 β 15:00 CET
- Venue: Lower Saxony Automotive Research – NiedersΓ€chsisches Forschungszentrum Fahrzeugtechnik (NFF), Research Airport Braunschweig, Germany (Shuttle available from Steigenberger Parkhotel at 08:15)
- Hosts: Hosted by iTUBS GmbH in partnership with the BLB+ network and LiPLANET
- Target Audience: Battery cell manufacturers, machinery & equipment companies, RTOs, pilot-line operators, public agencies, and funding bodies
- Registration: Registration is required via the IBPC Registration Portal (ticketed event / fee applies).
π‘ Event Concept & Objectives
The event is designed as a practical strategy-to-implementation exchange held in conjunction with IBPC 2026. It focuses on the practical support structures and pilot capabilities needed between laboratory research and industrial scale-up.
Key Objectives:
- Connect European and national battery roadmap priorities with real-world implementation needs.
- Discuss support functions across
- open-access scale-up infrastructure,
- manufacturing readiness & equipment qualification,
- circularity & compliance, and
- skills & digitalisation.
- Explore opportunities for pre-competitive exchange, demonstrator showcases, and lightweight follow-up task forces.
ποΈ Event Agenda (6 November 2026)
| Time | Session Title | Focus / What this session is about |
|---|---|---|
| 09:00β09:20 | Welcome and Opening | Opening remarks and introduction to the event’s implementation focus. |
| 09:20β09:50 | Aligning European and National Battery Roadmaps for Industrial Scale-Up | Strategic perspectives from European and German levels on aligning priorities for battery scale-up. |
| 09:50β10:30 | Breakfast Networking, Posters and Demonstrators | Informal exchange over coffee and breakfast to explore current projects, research infrastructures, and industrial solutions. |
| 10:30β11:00 | What LiPLANET and BLB+ Can Contribute | Short presentation on the practical role of pilot-line networks and research infrastructures in supporting scale-up. |
| 11:00β11:15 | Introduction to Breakout Discussions | Overview of the four roundtable themes, rotation format, and expected outcomes. |
| 11:15β12:30 | Breakout Discussions | Interactive roundtables focused on practical bottlenecks, shared activities, and pre-competitive collaboration (includes 1 group rotation). |
| 12:30β13:20 | Networking Lunch | Informal networking lunch among companies, research facilities, public agencies, and funding actors. |
| 13:20β14:05 | Partner Exhibitions & Demonstrator Showcase | Exhibition slot featuring posters, roll-ups, demonstrators, and capability profiles from invited European partners. |
| 14:05β14:45 | Plenary Discussion: Which Topics Should Be Taken Forward? | Table moderators report back main findings to synthesize high-priority topics suitable for lightweight follow-up activities. |
| 14:45β15:00 | Closing and Next Steps | Summary of findings, post-event documentation, and outline of follow-up pathways. |
π¬ Interactive Breakout Roundtables
- Table 1: Open-Access Scale-Up Infrastructure β Which pilot and scale-up facilities are still missing between research results and industrial use?
- Table 2: Manufacturing Readiness and Equipment Qualification β What must be validated before battery technologies and equipment become investable at industrial scale?
- Table 3: Circularity, Battery Passport and Compliance Readiness β Which practical tools and data methods are needed to meet new EU battery regulations?
- Table 4: Skills, Digitalisation and Industrial Learning β Which skills and digital tools are most critical to reduce risk over the next 3β5 years?
ποΈ Registration
Registration is open on the official IBPC website: π Register via the IBPC Portal


